The hoisting system to hold the playfield while the
connectors
are mated.
I installed
a hook into one of
my ceiling beams, and used a ratcheting tie down to slowly lower the
playfield into position. The cabinet was placed on furniture
sliders (as all the rest of my machines) so that I can easily slide it
into place underneath the suspended playfield. The whole
thing
worked like a charm.